Stainless Steel Products

Nefton Exports Industries 

project details

Client: Jack Travol
Project Start: 24/04/2020
Product Required: 5900 Product
Investors Website: Topgear88.com
Client Location: Slovenija, Ljubljana
Value: 587.000$
Other: Your Custom

Brochure

Download our document to see specific data of the service and how we work.

BROCHURE.DOC
1.25M
BROCHURE.PDF
3.81M

Let’s Start Work
Together

Please feel free to contact us. We will get back to you with 1-2 business days. Or just call us now.

Our clients can avail from us a comprehensive range of Stainless SteelPlates that are manufactured in line with the prevailing industry standards. These plates can be availed in different grades like austenitic, duplex, martensitic and ferritic. Furthermore, the stainless steel plates offered by us can be provided in 3 mm to 100 mm thickness and 1000 mm to 3200 mm width. The length of these plates can be custom-made in 2438 mm/3048 mm/6096 mm and 13500 mm.

Features:

● Grades: Austenitic, Duplex, Martensitic, Ferritic

● Surface: No.1 Finished

● Thickness: 3 mm to 100 mm

● Width: 1000 mm to 3200mm

● Length: 2438 mm / 3048 mm / 6096 mm to 13500 mm

● All Grades : Austenitic, Duplex, Martensitic, Ferritic

● Special grades : 310S, 309S, 317L, 904L, Duplex 2005, 230

● Stainless Steel Plates Prime Materials – ASTM A240/ASME SA 240, NACE MR 01 – 75, EN 10204 3.1

● Coil, Sheet and plate dimension (in mm)

Electronic materials are the type of materials which are typically used as core elements in a variety of device applications. These elements can be, for example, memories, displays, LEDs and could be easily seen in daily electronic gadgets such as mobile phones, computers, laptops, tablets, GPS devices, LED bulbs, TVs and monitors.

Our Approach And Solution

The $4 million project was successfully completed in two separate phases with both phases coming in on schedule and the overall costs coming in under budget. Emergency repairs to the facility were completed on December 11th, 2014 which allowed for the facility to operate through the critical winter months. Permanent electrical repairs along with less critical site deficiencies were completed in April and May of 2016 when a longer facility shut-down could be tolerated. In order to meet the required schedule, TransGas delegated procurement and construction management services to WSP.